The ChargePoint map of charger locations in NYC |
Answering questions from the Board |
Intro. 1176, loosely called the "Charger Ready Bill" would require all new construction projects in NYC that are adding 4 or more new parking spaces to install the conduit and make sure the site has the proper electrical capacity for future electric vehicle charging equipment to be installed in up to 20% of the parking spaces added. This is a great bill because it isn't financially onerous on the owner, as it doesn't require them to install the EVSE's or even pull the wiring just yet, but have the electric raceways there for future use. It is not expensive at all to do this while you are building out the parking lot, but it becomes very expensive if you want to do it later as you often have to rip up the parking lot and trench to run the wiring. Having the parking lots and garages ready for future charging equipment will certainly lead to increased charge points as it will be quicker, less expensive and much easier to install them once the owner feels there is the need to.
Unfortunately right now New York just isn't ready for electric vehicles. I go into the City frequently and it's very difficult to get a charger that is available, near the destination I'm going to, working, and not blocked by a row of gas cars. I even did a blog post about the difficulty I had with my ActiveE once last year. Most of the time I go in there now I take my gas car because I can't be sure I'll be able to charge while I'm there and that's unfortunate for me and for the city. Instead of me driving my zero emission car there, I'm contributing to the air pollution problem that every major city has by driving my gas burning vehicle. I even have had people that live in the city email me to ask for advice about getting EV charging equipment installed where they live. It's very difficult to own an electric car if you live in the city because it's so difficult to get it charged without paying extraordinarily high installation fees well into the thousands of dollars. Hopefully Intro.1176 will pass and we can begin to get the hundreds and even thousands of charging stations that NYC needs to accommodate the wave of plug in cars that will be on the streets of NY in the near future.
ChargePoint
charging
electricity
EVSE
infrastructure
Intro 1176
New York
testify
-
5 (
88 ratings )
- Friday, November 15, 2013
0 Comments:
Post a Comment